Balance work for Rehabilitation and up-gradation of BameethaSatna section of NH-75 from Km 57+160 to Km 155+000 [Design length 97.840 km] in the state of Madhya Pradesh to two-lanes with paved shoulders on Engineering, Procurement and Construction (EPC) Mode
Procurement of Construction for Global Skill Park including Civil Work, MEP Work(Plumbing, Internel & External Electrification, LV Work, Fire Fighting System & Sanitary Fixtures) at Bhopal in the State of Madhya Pradesh. Consultancy- Tata Consulting Engineers.Client- Department of Technical Education, Skill Development & Employment Government of Madhya Pradesh
Four laning of Nanasa to Pidgaon from (Design Ch.95+000/Existing Ch.95+000) to (Design Ch.142+445/Existing Ch.141+530) Section of NH47(Old NH-59A) (Design Length -47.445km) under BharatmalaPariyojna Phase-I (Economic-Corridor) in the State of Madhya-Pradesh on HAM Mode-Package-III (Indore-Harda)
Six Laning Of Varanasi Aurangabad Section Of NH-2 In The State Of Uttar Pradesh & Bihar (from chainage Km 907.100 to Km 938.170)
Balance works for Rehabilitation and upgradation of Satna - Bela section of NH-75 from km 155+000 to km 202+040 [Design length 47.04 km] in the State of Madhya Pradesh to four-lanes with paved shoulders on Engineering, Procurement & Construction (EPC) Mode
Setting up, Operating, Managing & Maintaining CT Scan Diagnostics facility at 08 Government District Hospitals of Madhya Pradesh on Public-private partnership (PPP). Client – Madhya Pradesh Public Health Services Corporation Ltd. • Rewa • Singrauli • Anuppur • Umaria • Sidhi • Jabalpur • Dindori • Panna
Four laning of Katni Bypass Section of National Highway–30 (Old NH7) from Km 359+375 to Km 378+555 having a length of 19.230 Km in the state of Madhya Pradesh on Engineering, Procurement & Construction (EPC) Mode
Design, Construction and Development of Smart Roads Corridor Including Culverts, Sidewalks, MEP works, PHE works, Landscape, Utility Multi duct Under Smart Cities Mission – Sagar Smart City Projec.
Construction of road length 26.06 Km. (Main Road) and Alternate Road Kunda Bhaliwada- Meeratola 2.80 Km. (Total Length 28.86 Km.) i/c Electrification, Pole Shifting and Water Supply Work.
Upgradation & Renewal of Chandrapur Dabhara Kharsia Dharamjaigarh Patahlgaon Road (Length 91.00 km).
Two laning with Hard shoulder of Karesara-Khamariya-Silhati road section from km 0.000 to km 39.228 in the state of Chhattisgarh on Engineering Procurement & construction (EPC) mode
Widening of road to 2 lane with paved shoulder i/c construction of bridge & culverts in km 182 to 266/6 on NH-59A length 81.60 km (Indore -Betul road) State of MP on EPC mode.
Sr. No. | Ongoing / Running Projects | Site | Date of start/ appointed date of project |
---|---|---|---|
1 | Development work of sector B and D of sch. No 151 and 169 B,Indore | IDA | 05.10.2016 |
2 | Widening of Road to 2 lane with paved shoulders i/c construction of bridge & culverts in km 182 to 266/6 on NH-59A length 81.60 km (Indore- Betul road) on EPC mode in the State of Madhya Pradesh. Client- Ministry of Road Transport and Highway | NH-59(Indore Betul) | 27.03.2017 |
3 | Balance works for rehabilitation and upgradation of Satna-Bela section of NH-75 from km 155+000 to km 202+040 [design length 47.04km] in the state of Madhya Pradesh to four-lanes with paved shoulders through an Engineering Procurement and Construction (EPC) Mode Client- Ministry of Road Transport and Highways | Satna Bela | 05.05.2018 |
4 | Construction of Campus Infrastructure Phase-II for Indian Institute of Technology,Simrol campus at Indore (M.P.) | IIT,Simrol | 22.03.2018 |
5 | construction of 240 Nos NE type residential quarters (Balance General Civil Works Package) for 2x660 MW Shree Singaji Thermal Power Project (SSTPP) Stage-II near village Dongalia, Distt. Khandwa Madhya Pradesh India | MPPGCL, Khandwa | 20.08.2018 |
6 | construction of various buildings / structures and RCC road with bridge for 2x660 MW Shree Singaji Thermal Power Project (SSTPP) Stage-II near village Dongalia, Distt. Khandwa. Madhya Pradesh India | MPPGCL, Khandwa | 20.09.2018 |
7 | Construction of New Jail Complex at District Chhindwara in the state of Madhya Pradesh. Client- Madhya Pradesh Public Work Department | Chhindwara | 02.09.2019 |
8 | Four laning of Katni Bypass Section of National Highway-30 (Old NH-7) from Km 359+375 to Km 378+555 in the state of Madhya Pradesh. Client- National Highways Authority of India | Kanti By Pass | 05.03.2020 |
9 | Procurement of Construction for Global Skill Park including Civil Work, MEP Work (Plumbing, Internal & External Electrification, LV Work, Fire Fighting System & Sanitary Fixtures) at Bhopal in the State of Madhya Pradesh. Consultancy- Tata Consulting Engineers, Client- Department of Technical Education, Skill Development & Employement Government of Madhya Pradesh | Global Skill Park | 10.06.2020 |
10 | Construction of Tikariya (N.H.-12A at Km 55/6) Manegaon-Patha Road Length 26.06 Km. (Main Road) and Alternate Road Kunda Bhaliwada- Meeratola 2.80 Km. (Total Length 28.86 Km.) i/c Electrification, Pole Shifting and Water Supply Work. | Mandla | 14.08.2020 |
11 | CONST OF GNM TRAINNING CENTER AND HOSTEL BUILDING WITH DEV WORK AT BALAGHAT ANM PARISAR, BUDHI, BALAGHAT | Balaghat | 08.07.2020 |
12 | Design, Construction and Development of Smart Roads Corridor Including Culverts, Sidewalks, MEP works, PHE works, Landscape, Utility Multi duct Under Smart Cities Mission Sagar Smart City Project in the State of Madhya Pradesh. Client-Sagar Smart City Limited, Sagar | Sagar Smart City | 31.08.2020 |
13 | Tender for the work of 1st stage raising of lagoon No. II of ash dyke (Stage-I) along with construction of various structures such as overflow weir and raising of decantation well etc. at SSTPP, Stage-I (2x600 MW) Dongalia, Khandwa. | MPPGCL, Khandwa | 11.11.2020 |
14 | Construction of RCC Road from ash silo unit I to IV to west gate of NTH and road from Gate No.2 to MCR 500 MW in CHP area- (Tender ID No. 2020_MPPGC_112141_1) | MPPGCL, Khandwa | 3/31/2021 |
15 | Four laning of Nanasa to Pidgaon section of NH-47 (Old NH-59A) (Indore-Harda, Pkg-III) (Length-47.445 km) Design Ch. 95+000 Km to 142+445 km under Bharatmala Pariyojana Phase-I (Economic Corridor) in the State of Madhya Pradesh on Hybrid Annuity Mode. Client- National Highways Authority of India , Hybrid Annuity Mode-ADANI | Adani Road Transport Limited | 07.10.2021 |
16 | For Seting up, operating, Managing & Maintaining CT Scan (32 Slice) diagnostics facility at 30 GOVERNMENT DISTRICT HOSPITALS OF MADHYA PRADESH. Cluster III (Rewa,Singrauli, Anuppur, Umaria, Sidhi, jabalpur, Dindori, Panna) | Madhya Pradesh Public Health Services Corporation Ltd. | 03.05.2021 |
17 | Upgradation & Renewal of Chandrapur Dabhara Kharsia Dharamjaigarh Patahlgaon Road (Length 91.00 km) in the state of Chhatisgarh. Client- Chhattisgarh Public Work Department | Chhattisgarh PWD | 07.10.2021 |
18 | Infrastructure Upgradation work of Industrial Area Lamtara, Dist. Katni (MP) | MPIDCL | 23.08.2021 |
19 | Procurement of Materials & Equipment and all other works and things necessary for completion of works For Six Laning of Varanasi Aurangabad Section of NH-2 in the State of Uttarpradesh and Bihar | NHAI-WellSpun Enterprises | 10.11.2021 |
20 | Construction of balance works of major bridges between 'satna to nagod' at ch:11614.81(5x30.5m composite girder), ch:20025 (1x24.4m composite girder) and ch:26022 (5x24.4 composite girder), rob ch:17941 (1x36.0m composite girder), rub ch:28931(2x24.40m composite girder) including casting of deck slab & other ancillary works in connection with satna-panna section of lalitpur-singrauli new bg rail line project. | Western Central Railway, IREPS | - |
21 | Construction of balance earthwork & minor bridges from satna ch-0m to ch 43000m (31 nos.), including drain work, bridge approach, road works and other ancillary work from satna [ch-0m to ch-43000m section in connection with satna-panna new b.g. rail line project. | Western Central Railway, IREPS | - |
22 | Rehabilitation and Upgradation of Civil Work Package 11 under PPPMPRSP - Badvar - Tamra-Sitapur - Mauganj Road and Raipur - Karchuliyan to Supiya - Bhaluha - Mahsaon Road | MPRDC | - |
23 | Construction of Balance work of ROB, VUP and approaches at Km. 168 of Sidhi- Singrauli Section of NH-75E from Km. 83.4 to Km. 195.6 of Northern Coalfield Limited (NCL) in the state of Madhya Pradesh. | MPRDC | - |
24 | CONSTRUCTION OF NEW MEDICAL COLLEGE RAJGARH DISTRICT RAJGARH MP | PWD PIU Rajgarh | - |
Sr. No. | Completed Projects | Site | Date of start/ appointed date of project |
---|---|---|---|
1 | Construction of Bottom Ash Pond and allied works i/c road work & additional Fly Ash Pond | MPPGCL | 12.04.2011 |
2 | Widening and Reconstruction of Amarpatan-Gorsari-Badera Road Package-11 (46.890KM) | MPPGCL | 06.06.2011 |
3 | Construction of Raw Water Reservoir for Jhabua Power Ltd. (JPL), Seoni District,MP | Jhabua Power Ltd. | 28.12.2021 |
4 | Construction of New Permanent Roads for 1x600 MW +1x660 MW JPL, Seoni District,Madhya Pradesh | Jhabua Power Ltd. | 27.01.2012 |
5 | Construction of Various Buildings at Hidayatullah National Law University, Raipur (C.G.) including Water Supply, Sanitary Fittings & Electrical Work. | Office of the Registrar Hidayatullah National Law University, Raipur (C.G.) | 28.01.2012 |
6 | Co-Construction of Drain,Upgradation of Road and beautification at NH-7 including maintenance from Saman Tiraha to Railway Tiraha as per requirement & as per NIT No 118, dated-01.12.2012 age-II near village Dongalia, Distt. Khandwa. Madhya Pradesh India | Rewa Municipal Corporation | 2/11/2013 |
7 | Construction of CC Road and Drain at (a) Janta College Road Ward-10, (b) Sanjay Nagar, Koriyan Road Ward-14 and ( c) Chuna Bhatta to Pokhari Tola Road Ward-15 as per NIT No.119, dated 01.12.2012 | Rewa Municipal Corporation | 2/11/2013 |
8 | "Black toping/concreting roads,construction of new bituminuous/concrete roads,concrete lining of drains/construction of RCC drains and slope protection work for plant area of 2x600 MW, Shri Singaji Thermal Power Project at Village Dongalia/Purni,Dist. Khandwa(MP) India.- (Tender Spn.No. MPPGCL/Civil Engineering/SSTPP/ICB/09)" Client- National Highways Authority of India | MPPGCL | 14.02.2013 |
9 | Infrastructure Development Works (Includes Asphalting of Roads, Water Supply, Strom Water Drain, OHT,UGT,Administrative Building & Other Services) for Proposed Multi Product Industrial Area at Releakund Khajuri Dist.Badwani (M.P) | MPAKVN | 06.12.2014 |
10 | PHPS Totladoh-Tender for the work of Providing & Fixing of permanent steel supports and RCC precast sleepers sleepers and Guniting works in Adit Tunnel No.1 at PHPS,Totladoh.- Tender Spn.No ED(CIVIL-ENGG)/PHPS/1277 | MPPGCL | 7/19/2013 |
11 | Infrastructure Development like Construction of Roads , Culverts, Storm water Drainage, Electrical Net work -11KVA, L.T. Power line with a 5 MVA Sub-station , Street lighting, 2 MLD Water supply Net works at Industrial Area Tajpur, Teh.-Ujjain District – Ujjain vide agreement No. AKVN/U/AC/14/1295 dated 27.06.2014 | MPAKVN | 6/27/2014 |
12 | Providing and laying of storm water drainage pipe line including construction of chambers, providing and fixing of 100 mm thick cement concrete paver block at Industrial Area 1,2 & 3 Dewas. vide agreement No. AKVN/U/AC/14/1301 dated 27.06.2014 | MPAKVN | 6/27/2014 |
13 | Widening & Strengthening of Road from Hutar to Chainpur Road 9length-32.05 km) for the year 2014-15 in the state of Jharkhand vide Agreement No 642(En) dated 16.05.2015 | R.C.D Road Division, Jharkhand | 5/16/2015 |
14 | Widening & Strengthening of Tarana-kanipura-Ujjain Road, under Simhastha-2016 in the state of Madhya Pradesh vide LOA No 90 dated 05.02.2015 | P.W.D. Simhastha Division Ujjain | 2/5/2015 |
15 | Upgradation of Outer Ring Road from Naikhedi to Maxi Road via Sodang Jaithal Length 28.95 km Under Simhastha | P.W.D. Simhastha Division Ujjain | 1/17/2015 |
16 | Widening and Reconstruction of Madhya Pradesh District Connectivity Sector Project- Package F: Persuna-Mahua (upto Barkha Road) | MPRDC | 5/1/2015 |
17 | Widening and reconstruction of Madhya Pradesh District Connectivity Sector Package Mahidpur-Panvihar Jeevaji Nagar (MDR-09-04) & Shajapur Bercha (MDR-11-02) Road in the state of Madhya Pradesh vide LOA No 007259 dated 10/12/2015 | MPRDC-GDCL | 12/10/2015 |
18 | Tender for Construction of RCC road including auxiliary work from Zero point at NH-78 to Power House gate No.2 at SGTPS, Birshingpur- Tender Spn No. ED/Civil-Engg/SGTPS/1295 (E-Tender No.3538) | MPPGCL | 12/21/2015 |
19 | Repair and improvement works of existing bituminuous link road with RCC road including allied cross drainage works-(Tender spn. No. CE(Civil-Engineering/SGTPS/1300 {E-Tender No. MPPGCL/Tender 6332) | MPPGCL | 10/5/2017 |
20 | Construction of Sidhi Khamarji Road in KM 1/2 to 20/8 Total Length 19.80 Km under sub division Churhat Dist. Sidhi in the state of Madhya Pradesh vide LOA No 2723/SAC/2016-17 dated 01/07/2016 | PWD,Sidhi Division,Sidhi (M.P) | 7/1/2016 |
21 | General Civil Work Package of 2x660 MW Shri Singaji Thermal Power Project Stage-II, Near village Dongalia,Dist. Khandwa (MP) India (Tender Spn No. MPPGCL/CIVIL ENGINEERING/SSTPP-II/ICB-01) (Online Tender Spn No 3497) | MPPGCL | 2/4/2016 |
22 | Construction of Ash Dyke of minimum 88 lakh cum storage capacity on turnkey basis at 2x660 MW Shree Singhaji Thermal Power Project, Stage-II,(SSTPP) near village Dongalia, District Khandwa, Madhya Pradesh | MPPGCL-L&T | 2/29/2016 |
23 | Widening and Reconstruction of Baihar-Mukki-Garhi (SH-26) Road (Total Length-32.959 Km.)- Tender No. 454 | MPRDC | 6/6/2016 |
24 | Widening and Reconstruction of Madhya Pradesh District Road II Sector Project-Package No.-19; Sohagpur-Manpur Road (MP-MDR-46-01) vide LOA No. 17145/MPRDC/Procu/LoA/MPDRIISP/9 Pkg./297/2016 dated 17.01.2017 | MPRDC | 2/27/2017 |
25 | Black toping/concreting over existing WBM approach road to various buildings in plant area construction of new bituminuous/concrete roads in plant area, construction of hume pipe culverts and concrete paving work for 2x600 MW SSTPP Phase-I Dongalia Dist-Khandwa | MPPGCL | 5/18/2017 |
26 | Two Laning with Hard Shoulder of Karesara-Khamhariya-Silhati road section from Km 0.000 to km 39.228 in the state of Chhatisgarh on Engineering,Procurement & Construction (EPC) Mode | CGRDC | 2/25/2017 |
27 | Two Laning with Hard Shoulder of Kawardha-Rampur-Khamaria road section from Km 0.000 to km 28.089 (Design chainage from km 0.000 to km 28.070) in the state of Chhatisgarh on Engineering,Procurement & Construction (EPC) Mode | CGRDC | 5/5/2017 |
28 | Balance works for rehabilitation and upgradation of Bameetha-Satna section of NH-75 from km 57+160 to km 155+000 [design length 97.84km] in the state of Madhya Pradesh to four-lanes with paved shoulders in the state of Madhya Pradesh on EPC mode | MoRTH | 3/20/2018 |